Choosing Datums: Which Features Get A, B and C
Choosing datums starts with how the part mates: A is the face it seats on, B locates it on that face, C stops the rest. Worked through on a real clamp.
Plenty of datum schemes start as the two edges nearest the CAD origin. Choosing datums that way hands the shop a reference frame that has nothing to do with how the part works, so inspection measures from the wrong place.
What Features Are Supposed to Be Datums on the Part I'm Designing?
The ones that locate the part in its assembly. Datum A is usually the largest face that seats against the mating part, B is the feature that sets its position on that face, and C stops whatever motion is left.
R. Dean Odell opens GD&T: Choosing Datums by saying he gets that question all the time, then works it through on a machinist's parallel clamp. He starts from requirements, not geometry. The jaws have to grip flat, close without overbite and sit parallel on a table. The big mating face of each jaw becomes A, because that's where the parts meet and where every measurement should come from.
Choosing Datums for B and C
B is where it gets interesting. Odell lists the candidates: a small side face, one hole, both holes, or a center plane through the jaw. He picks the center plane, since a clamp gets flipped over in use and you don't want to favor one side. He admits it's harder to inspect, since you'd need a centering vise to find zero.
C exists because A and B alone leave the holes unlocated in one direction. He picks the end face where the two jaws line up at assembly. The two-hole pattern could work too, he says, but only if the outside of the part had no job beyond existing. This clamp's outside has orientation requirements, so the holes lose.
The clamp screw shows that not every part needs three. The thread is A because it centers the screw (or the major diameter, if you'd rather sit it in a V-block). The underside of the shoulder is B, and the part is symmetric enough that nothing is left for a C.
Why the Order Matters on the Shop Floor
The GD&T Basics page on datums spells out the mechanics. The primary needs at least three points of contact and takes three degrees of freedom, the secondary needs two, and the tertiary is the last one fixed. It's also the order an inspector sets the part on the granite. Make a non-functional face your A and you've told everyone to measure from a surface that doesn't matter.
Functional datums also keep hole callouts honest, which plus/minus vs position tolerance for hole patterns gets into. When several parts stack, run the tolerance stack-up from those same datums. For shafts built on an axis datum, see runout vs concentricity.
Our CNC work defaults to ISO 2768-m, down to ±0.01 mm where the drawing calls for it. If you want parts inspected and reported against your datum scheme, ask us when you quote.
Need a part made?
Upload your file for an instant price.